We connect infrastructure expertise with targeted biological applications, from public sewer networks and hotel facilities to industrial wastewater and the sludge line. Each proposal starts with actual conditions, an agreed objective and operating costs.

These settings describe areas for assessment and design; they are not a catalogue of completed projects or a guarantee of results.
01

Municipal networks & pumping stations

BAUS field experience is the starting point. We assess targeted application in branches with recurring FOG deposits, cleaning requirements, or odour and hydrogen sulfide issues. Upstream dosing points are connected with downstream monitoring, so the evaluation addresses system operation rather than only the appearance of a single manhole.

What we assess

  • Route and flows
  • Cleaning history
  • Selected indicators and downstream checks
02

Hotels & professional food service

We assess grease interceptors, kitchen branches, local pumping stations and, where present, a private wastewater treatment facility. The programme is designed around actual facility operation and available maintenance data. The objective is to evaluate whether a suitable biological intervention can limit the reaccumulation of organic deposits and the associated operating burden.

What we assess

  • Sources of fatty wastewater
  • Operating changes and cleaning
  • Downstream treatment
03

Food & beverage manufacturing

Our initial focus is dairy plants, meat processing and prepared-food production. The choice of approach follows characterisation of the actual wastewater and coordination with the facility operator. Organic and FOG loads, existing treatment and sludge-management objectives are assessed. A protocol from a different production process is not transferred automatically.

What we assess

  • Wastewater characterisation and flow
  • Existing processes
  • Suitability trial and application cost
04

Sludge line & holding tanks

An intervention may be considered in a defined part of a WWTP rather than across the entire system. Together with the operator and suitable process support, we assess whether organic-sludge management, supernatant removal and dewatering can be supported. We distinguish changes in dry solids from lower wet weight and examine which transport or disposal costs are actually avoided.

What we assess

  • Solids balance and inventories
  • Solids concentration after dewatering
  • Actual management costs
Manufacturer application report
05Under technical evaluation

Anaerobic digestion & biogas

We are investigating specialist microbial and micronutrient support programmes for anaerobic digesters. Before any application is proposed, technical data for the specific feedstock, suitable scientific support and a trial plan are required. Evaluation will focus on process stability, methane production relative to feed and total cost. This is not yet presented as a confirmed BAUS application programme.

What we assess

  • Feed characterisation
  • Comparable digester data
  • Approved trial protocol
PROPOSED INITIAL APPROACH

Assessment → technical suitability → controlled trial → evaluation

Let’s start with your facility.